编程介的小学生 2017-05-27 04:13 采纳率: 20.5%
浏览 801
已采纳

Pizza delivery

Problem Description
Your Irish pizza and kebab restaurant is doing very well. Not only is the restaurant full almost every night, but there is also an ever increasing number of deliveries to be made, all over town. To meet this demand, you realize that it will be necessary to separate the delivery service from the restaurant. A new large kitchen, only for baking pizzas and being a base for deliveries, has to be established somewhere in town. The main cost in the delivery service is not the making of the pizza itself, but the time it takes to deliver it. To minimize this, you need to carefully plan the location of the new kitchen. To your help you have a database of all last year's deliveries. For each block in the city, you know how many deliveries were made there last year. The kitchen location will be chosen based on the assumption that the pattern of demand will be the same in the future.
Your city has a typical suburban layot – an orthogonal grid of equalsize square blocks. All places of interest (delivery points and the kitchen) are considered to be located at street crossings. The distance between two street crossings is the Manhattan distance, i.e., the number of blocks you have to drive vertically, plus the number of blocks you have to drive horizontally. The total cost for a delivery point is its Manhattan distance from the kitchen, times the number of deliveries to the point. Note that we are only counting the distance from the kitchen to the delivery point.
Even though we always drive directly back to the kitchen after a delivery is made, this (equal) distance is not included in the cost measure.

Input
On the rst line, there is a number, 1 <=n <=20, indicating the number of
test cases. Each test case begins with a line with two integers, 1 <= x <= 100, 1<= y <= 100, indicating the size of the two-dimenstional street grid. Then follow y lines, each with x integers, 0<= d <=1000, indicating the number of deliveries made to each street crossing last year.

Output
For each test case, output the least possible total delivery cost (the sum of all delivery costs last year), assuming that the kitchen was located optimally.There should be one line for each test case, with an integer indicating the cost, followed by a single space and the word 'blocks'.

Sample Input
2
4 4
0 8 2 0
1 4 5 0
0 1 0 1
3 9 2 0
6 7
0 0 0 0 0 0
0 1 0 3 0 1
2 9 1 2 1 2
8 7 1 3 4 3
1 0 2 2 7 7
0 1 0 0 1 0
0 0 0 0 0 0

Sample Output
55 blocks
162 blocks

  • 写回答

1条回答 默认 最新

报告相同问题?

悬赏问题

  • ¥50 有数据,怎么建立模型求影响全要素生产率的因素
  • ¥50 有数据,怎么用matlab求全要素生产率
  • ¥15 TI的insta-spin例程
  • ¥15 完成下列问题完成下列问题
  • ¥15 C#算法问题, 不知道怎么处理这个数据的转换
  • ¥15 YoloV5 第三方库的版本对照问题
  • ¥15 请完成下列相关问题!
  • ¥15 drone 推送镜像时候 purge: true 推送完毕后没有删除对应的镜像,手动拷贝到服务器执行结果正确在样才能让指令自动执行成功删除对应镜像,如何解决?
  • ¥15 求daily translation(DT)偏差订正方法的代码
  • ¥15 js调用html页面需要隐藏某个按钮