编程介的小学生 2017-09-01 01:31 采纳率: 20.5%
浏览 748
已采纳

Electricity

Blackouts and Dark Nights (also known as ACM++) is a company that provides electricity. The company owns several power plants, each of them supplying a small area that surrounds it. This organization brings a lot of problems - it often happens that there is not enough power in one area, while there is a large surplus in the rest of the country.

ACM++ has therefore decided to connect the networks of some of the plants together. At least in the first stage, there is no need to connect all plants to a single network, but on the other hand it may pay up to create redundant connections on critical places - i.e. the network may contain cycles. Various plans for the connections were proposed, and the complicated phase of evaluation of them has begun.

One of the criteria that has to be taken into account is the reliability of the created network. To evaluate it, we assume that the worst event that can happen is a malfunction in one of the joining points at the power plants, which might cause the network to split into several parts. While each of these parts could still work, each of them would have to cope with the problems, so it is essential to minimize the number of parts into which the network will split due to removal of one of the joining points.

Your task is to write a software that would help evaluating this risk. Your program is given a description of the network, and it should determine the maximum number of non-connected parts from that the network may consist after removal of one of the joining points (not counting the removed joining point itself).

Input

The input consists of several instances.

The first line of each instance contains two integers 1 <= P <= 10 000 and C >= 0 separated by a single space. P is the number of power plants. The power plants have assigned integers between 0 and P - 1. C is the number of connections. The following C lines of the instance describe the connections. Each of the lines contains two integers 0 <= p1, p2 < P separated by a single space, meaning that plants with numbers p1 and p2 are connected. Each connection is described exactly once and there is at most one connection between every two plants.

The instances follow each other immediately, without any separator. The input is terminated by a line containing two zeros.

Output

The output consists of several lines. The i-th line of the output corresponds to the i-th input instance. Each line of the output consists of a single integer C. C is the maximum number of the connected parts of the network that can be obtained by removing one of the joining points at power plants in the instance.

Sample Input

3 3
0 1
0 2
2 1
4 2
0 1
2 3
3 1
1 0
0 0
Sample Output

1
2
2

  • 写回答

1条回答

  • threenewbee 2017-09-16 15:52
    关注
    本回答被题主选为最佳回答 , 对您是否有帮助呢?
    评论

报告相同问题?

悬赏问题

  • ¥15 基于卷积神经网络的声纹识别
  • ¥15 Python中的request,如何使用ssr节点,通过代理requests网页。本人在泰国,需要用大陆ip才能玩网页游戏,合法合规。
  • ¥100 为什么这个恒流源电路不能恒流?
  • ¥15 有偿求跨组件数据流路径图
  • ¥15 写一个方法checkPerson,入参实体类Person,出参布尔值
  • ¥15 我想咨询一下路面纹理三维点云数据处理的一些问题,上传的坐标文件里是怎么对无序点进行编号的,以及xy坐标在处理的时候是进行整体模型分片处理的吗
  • ¥15 CSAPPattacklab
  • ¥15 一直显示正在等待HID—ISP
  • ¥15 Python turtle 画图
  • ¥15 stm32开发clion时遇到的编译问题