编程介的小学生 2017-10-24 07:53 采纳率: 20.3%
浏览 881
已采纳

Can We Build This One?

Description
“Highways are built, then life is rich.” Now people of Big Town want to become rich, so they are planning to build highways to connect their villages.
Big Town is really big and has many villages. Its people plan to build some highways between some pairs of villages so that every pair of villages is connected by the highways either directly or indirectly. After surveying the geographical surroundings, they find that there are some paths along with highways can be built. Every path is denoted by a triplet (a, b, c) which means a highway can built between the a-th village and the b-th village with a cost of c. In order to save money, they will select only part of the paths to build highways along so that the total cost to build highways along the selected paths is minimal under the condition that every pair of villages is connected.
It is possible that multiple such selections exist. People from every village want to have those highways of good interest to them built. But some highways can never appear in the selection since they are much too costly. So people ask whether a certain highway can be selected if they agree to cut the cost. Your task is to design a program to answer their queries.
Input
The first line of input contains three integers N, M and Q (1 < N ≤ 1,000, N − 1 ≤ M ≤ 100,000, 0 < Q ≤ 100,000), where N is the number of villages, M is the number of paths, and Q is the number of queries. Each of the next M lines contains three integers a, b, and c (1 ≤ a, b ≤ N, a ≠ b, 0 ≤ c ≤ 1,000,000). The triplet (a, b, c) describes a path. Each of following Q lines contains two integer i and x (1 ≤ i ≤ M, 0 ≤ x) describing a query, “Can a highway be built along the i-th path if the cost of is reduced to x?” x is strictly lower than the original cost of building a highway along the i-th path. It is assumed that every pair of village will be connected either directly or indirectly if all possible highways are built. And there may be more than one highway that can be built between a pair of villages.
Output
Output one line for each query. Output either “Yes” or “No” as the answer to the the query.
Sample Input
3 4 3
1 2 10
1 3 6
2 3 4
1 3 7
4 6
1 7
1 5
Sample Output
Yes
No
Yes

  • 写回答

1条回答 默认 最新

  • threenewbee 2017-11-06 14:02
    关注
    本回答被题主选为最佳回答 , 对您是否有帮助呢?
    评论

报告相同问题?

悬赏问题

  • ¥16 Qphython 用xlrd读取excel报错
  • ¥15 单片机学习顺序问题!!
  • ¥15 ikuai客户端多拨vpn,重启总是有个别重拨不上
  • ¥20 关于#anlogic#sdram#的问题,如何解决?(关键词-performance)
  • ¥15 相敏解调 matlab
  • ¥15 求lingo代码和思路
  • ¥15 公交车和无人机协同运输
  • ¥15 stm32代码移植没反应
  • ¥15 matlab基于pde算法图像修复,为什么只能对示例图像有效
  • ¥100 连续两帧图像高速减法