编程介的小学生 2017-08-27 07:20 采纳率: 20.5%
浏览 820
已采纳

Trail Walk

FatMouse is busy organizing the coming trail walk. After the route for the trail walk has been determine, the next important task is to set the location of CPs(check point).

The route is composed by n line segments which only intersect on their endpoints. Set the starting point of the trail walk as origin, the coordinate of the endpoints are p1 p2 p3 ... pn, in the order of walking direction.

Now FatMouse wants to set m CPs on the route in such way that the walking distance between adjacent CPs are all equal. You can treat the starting point as the CP0 and the end as CPm+1.

Input

There are multiple test cases. The first line of each case contains two integer n, m(1 <= n, m <= 1000). Then n pairs of integer followed, giving the coordinate of pi.

Output

The first line of each case, output "Route case_number", Then m lines followed, the ith line contains "CPcase_num: (xi, yi)" where (xi, yi) represent the coordinate of the CPi. Always keep three number after the decimal point.

Sample Input

3 3
1 1
2 3
3 5
Sample Output

Route 1
CP1: (1.026, 1.051)
CP2: (1.684, 2.368)
CP3: (2.342, 3.684)

  • 写回答

1条回答

  • devmiao 2017-08-27 15:52
    关注
    本回答被题主选为最佳回答 , 对您是否有帮助呢?
    评论

报告相同问题?

悬赏问题

  • ¥15 delta降尺度计算的一些细节,有偿
  • ¥15 Arduino红外遥控代码有问题
  • ¥15 数值计算离散正交多项式
  • ¥30 数值计算均差系数编程
  • ¥15 redis-full-check比较 两个集群的数据出错
  • ¥15 Matlab编程问题
  • ¥15 训练的多模态特征融合模型准确度很低怎么办
  • ¥15 kylin启动报错log4j类冲突
  • ¥15 超声波模块测距控制点灯,灯的闪烁很不稳定,经过调试发现测的距离偏大
  • ¥15 import arcpy出现importing _arcgisscripting 找不到相关程序