Parts Process

To build a machine, a lot of parts need to be produced. A question is how to arrange the processing order to minimize the total delay time of the parts.

Input

The input consists of no more than 20 test cases.

The first line of each test case contains an integer n (<= 15). Then n lines follow.

The i-th (start from 1) line contains two positive integers pi and di, where pi is the i-th part's process time (that is, pi minute(s) must be taken to produce the i-th part), and di the deadline of the i-th part.

These lines are in ascending order of di. The total process time is no more than 100.

Output

Define:

Fi - the finishing time of the i-th part;
Di - the delay time of the i-th part, that is, Di = max{(Fi - di) , 0};
T - the total delay time, that is, T = sum(Di).

For each test case, two lines should be outputted.

The first line contains the minimal T.

The second line contains n integers, indicating the processing order of the parts.

If there are more than one orders, you should output the lexicographically smaller one.

Sample Input

3
3 3
2 3
1 20

Sample Output

2
1 2 3

  • 写回答

1条回答

  • threenewbee 2017-09-27 14:11
    关注
    本回答被题主选为最佳回答 , 对您是否有帮助呢?
    评论

报告相同问题?

悬赏问题

  • ¥20 sub地址DHCP问题
  • ¥15 delta降尺度计算的一些细节,有偿
  • ¥15 Arduino红外遥控代码有问题
  • ¥15 数值计算离散正交多项式
  • ¥30 数值计算均差系数编程
  • ¥15 redis-full-check比较 两个集群的数据出错
  • ¥15 Matlab编程问题
  • ¥15 训练的多模态特征融合模型准确度很低怎么办
  • ¥15 kylin启动报错log4j类冲突
  • ¥15 超声波模块测距控制点灯,灯的闪烁很不稳定,经过调试发现测的距离偏大