编程介的小学生 2019-10-03 20:07 采纳率: 20.5%
浏览 65

Sightseeing tour 具体的实现

Description

The city executive board in Lund wants to construct a sightseeing tour by bus in Lund, so that tourists can see every corner of the beautiful city. They want to construct the tour so that every street in the city is visited exactly once. The bus should also start and end at the same junction. As in any city, the streets are either one-way or two-way, traffic rules that must be obeyed by the tour bus. Help the executive board and determine if it's possible to construct a sightseeing tour under these constraints.
Input

On the first line of the input is a single positive integer n, telling the number of test scenarios to follow. Each scenario begins with a line containing two positive integers m and s, 1 <= m <= 200,1 <= s <= 1000 being the number of junctions and streets, respectively. The following s lines contain the streets. Each street is described with three integers, xi, yi, and di, 1 <= xi,yi <= m, 0 <= di <= 1, where xi and yi are the junctions connected by a street. If di=1, then the street is a one-way street (going from xi to yi), otherwise it's a two-way street. You may assume that there exists a junction from where all other junctions can be reached.
Output

For each scenario, output one line containing the text "possible" or "impossible", whether or not it's possible to construct a sightseeing tour.
Sample Input

4
5 8
2 1 0
1 3 0
4 1 1
1 5 0
5 4 1
3 4 0
4 2 1
2 2 0
4 4
1 2 1
2 3 0
3 4 0
1 4 1
3 3
1 2 0
2 3 0
3 2 0
3 4
1 2 0
2 3 1
1 2 0
3 2 0
Sample Output

possible
impossible
impossible
possible

  • 写回答

0条回答 默认 最新

    报告相同问题?

    悬赏问题

    • ¥15 如何实验stm32主通道和互补通道独立输出
    • ¥30 这是哪个作者做的宝宝起名网站
    • ¥60 版本过低apk如何修改可以兼容新的安卓系统
    • ¥25 由IPR导致的DRIVER_POWER_STATE_FAILURE蓝屏
    • ¥50 有数据,怎么建立模型求影响全要素生产率的因素
    • ¥50 有数据,怎么用matlab求全要素生产率
    • ¥15 TI的insta-spin例程
    • ¥15 完成下列问题完成下列问题
    • ¥15 C#算法问题, 不知道怎么处理这个数据的转换
    • ¥15 YoloV5 第三方库的版本对照问题