I was looking at this post, and it is close to what I need: PHP - How to count 60 days from the add date
However, in that post, the calculation is performed by adding 60 days to the current date. What I need to do is calculate the date based on a variable date (and not the current date).
Something like this:
$my_date = $some_row_from_a_database;
$date_plus_10_days = ???;
Anyone know how to do that?
Thanks