编程介的小学生 2016-12-22 10:35 采纳率: 20.5%
浏览 892
已采纳

Desert King

Description

David the Great has just become the king of a desert country. To win the respect of his people, he decided to build channels all over his country to bring water to every village. Villages which are connected to his capital village will be watered. As the dominate ruler and the symbol of wisdom in the country, he needs to build the channels in a most elegant way.

After days of study, he finally figured his plan out. He wanted the average cost of each mile of the channels to be minimized. In other words, the ratio of the overall cost of the channels to the total length must be minimized. He just needs to build the necessary channels to bring water to all the villages, which means there will be only one way to connect each village to the capital.

His engineers surveyed the country and recorded the position and altitude of each village. All the channels must go straight between two villages and be built horizontally. Since every two villages are at different altitudes, they concluded that each channel between two villages needed a vertical water lifter, which can lift water up or let water flow down. The length of the channel is the horizontal distance between the two villages. The cost of the channel is the height of the lifter. You should notice that each village is at a different altitude, and different channels can't share a lifter. Channels can intersect safely and no three villages are on the same line.

As King David's prime scientist and programmer, you are asked to find out the best solution to build the channels.
Input

There are several test cases. Each test case starts with a line containing a number N (2 <= N <= 1000), which is the number of villages. Each of the following N lines contains three integers, x, y and z (0 <= x, y < 10000, 0 <= z < 10000000). (x, y) is the position of the village and z is the altitude. The first village is the capital. A test case with N = 0 ends the input, and should not be processed.
Output

For each test case, output one line containing a decimal number, which is the minimum ratio of overall cost of the channels to the total length. This number should be rounded three digits after the decimal point.
Sample Input

4
0 0 0
0 1 1
1 1 2
1 0 3
0
Sample Output

1.000

  • 写回答

1条回答 默认 最新

报告相同问题?

悬赏问题

  • ¥15 华为ensp模拟器中S5700交换机在配置过程中老是反复重启
  • ¥15 java写代码遇到问题,求帮助
  • ¥15 uniapp uview http 如何实现统一的请求异常信息提示?
  • ¥15 有了解d3和topogram.js库的吗?有偿请教
  • ¥100 任意维数的K均值聚类
  • ¥15 stamps做sbas-insar,时序沉降图怎么画
  • ¥15 买了个传感器,根据商家发的代码和步骤使用但是代码报错了不会改,有没有人可以看看
  • ¥15 关于#Java#的问题,如何解决?
  • ¥15 加热介质是液体,换热器壳侧导热系数和总的导热系数怎么算
  • ¥100 嵌入式系统基于PIC16F882和热敏电阻的数字温度计