Power transmission

Problem Description
The project West-East power transmission is famous around the world. It transmits the electricity from western areas to east China. There are many nodes in the power system. Each node is connected with several other nodes in the system by cable. Power can be only transmitted between two connected nodes. For each node, it can’t send power to two or more other nodes at the same time.
As we have all known, power will be loss during the transmission. Bob is the chief engineer of the project. He wants to build a transmission line which send power from one node to another node and minimize the power loss at the same time. Now he asks you to help him solve the problem.

Input
There are several test cases. For each test case, the first line contains an integer N (0 < N ≤ 50000) which represents the number of nodes in the power system. Then there will be N groups of data following. For the i-th(0 < i ≤ N) group, the first line is an integer ki (ki ≤ 50), which means the node i is connected with ki nodes. The rest of the i-th group data are divided into ki lines. Each line contains an integer ai (0 < ai ≤ N, ai ≠ i) and an integer bi (0 ≤ bi ≤ 100), which represents power can be transmitted from node i to ai and will loss bi% while transmitting. The last line of input data contains three integers separated by single spaces. The first one is s, the second is t (0 < s, t ≤ N), and the third is the total power M (0 < M ≤ 10^6) at node s.

Output
For each test case, output the minimum of loss power while transmitting from node s to node t. The result should be printed with two digits to the right of the decimal point. If power cannot be transmitted from node s to node t, output “IMPOSSIBLE!” in a line.

Sample Input
4
2
2 50
3 70
2
1 30
4 20
2
1 10
4 40
0
1 4 100

Sample Output
60.00

  • 写回答

2条回答 默认 最新

  • threenewbee 2017-02-28 14:35
    关注
    本回答被题主选为最佳回答 , 对您是否有帮助呢?
    评论
查看更多回答(1条)

报告相同问题?

悬赏问题

  • ¥15 2020长安杯与连接网探
  • ¥15 关于#matlab#的问题:在模糊控制器中选出线路信息,在simulink中根据线路信息生成速度时间目标曲线(初速度为20m/s,15秒后减为0的速度时间图像)我想问线路信息是什么
  • ¥15 banner广告展示设置多少时间不怎么会消耗用户价值
  • ¥16 mybatis的代理对象无法通过@Autowired装填
  • ¥15 可见光定位matlab仿真
  • ¥15 arduino 四自由度机械臂
  • ¥15 wordpress 产品图片 GIF 没法显示
  • ¥15 求三国群英传pl国战时间的修改方法
  • ¥15 matlab代码代写,需写出详细代码,代价私
  • ¥15 ROS系统搭建请教(跨境电商用途)